Since the last update the lighting layout was revised to work with the existing joist layout and revised drawings were ready for the electrician last Friday. On Monday the electricians were back out running wire and setting boxes. The plumbers were also roughing-in for the new plumbing. Today was a quiet day as all the plumbing is roughed in and the electrician is waiting on the recessed cans to arrive which should be Friday. Hoping to have inspection on Monday.